Boiler Replacement
Project Summary
To remove the existing cast iron boilers and replace these with new, modern equivalents.
A client approached us asking us to remove several cast iron boiler systems, and replace them all with new, modernized equivalents, this involved replacing everything from the boilers to the pipework. This particular client also required all personnel on site to undergo security checks and background checks, something which all of our staff passed with ease. Whilst we didn’t complete any of the installation or plumbing, we did have to remove all old equipment and position all new equipment, ready for the plumbers to begin works.
The boilers were over 7 tonne each and had to be removed in one single unit, this was because the inside of the boilers were lined with Asbestos, therefore absolutely no damage could be done to them.
Another tricky element of this job was that the boilers could not be removed using lifting equipment, this was because of the location of where they were situated within the building.
Snook’s Lifting and Engineering Ltd came up with a solution, we utilized various pieces of ground handling tackle and strategically planned the safest and most efficient route out as possible.
By the end of the job, all old equipment was removed and handed over to the waste transfer specialists, with all new equipment in place and ready to be plumbed in.